The EFINOR group has signed major contract for the Hinkley Point C EPR
In October 2017, EFINOR signed the contract for the design, manufacturing and installation of the 2 main control rooms, the simulator and the six adjacent rooms of the 2 units at the Hinkley Point C EPR, at Bridgwater in Somerset for EDF Energy Nuclear New Build (NNB).